ROCHE (Estación de Francia)
The event was marked by an extraordinary decorative lighting set in the "Estació de França", both in the hall and into the main wall by the terminal. Although the design and lighting engineers were German, they needed the entire infrastructure and staff: rigging, equipment, cargo ...
Other contributions by AP Productions were the stage, lighting and sound and also a dance floor.
At the cocktail there was a string quartet playing and at the end of the dinner there was a dance orchestra on stage with a "front line" of four singers.
Another important detail (the event was in December) was the heating by stoves. We placed a large number of stoves that succeeded in creating a warm atmosphere.
Other contributions by AP Productions were the stage, lighting and sound and also a dance floor.
At the cocktail there was a string quartet playing and at the end of the dinner there was a dance orchestra on stage with a "front line" of four singers.
Another important detail (the event was in December) was the heating by stoves. We placed a large number of stoves that succeeded in creating a warm atmosphere.











